Our Capabilities

Facilities

STEICO facilities are ever expanding and currently include 8 recently manufactured custom built industrial facilities located in one commercial business park in Oceanside, California. Each facility is logistically positioned to create a streamlined production flow with one another.

1814 – 36,935 SF
(Main building) Welding, Fabrication, Final Assembly & Inspection

1812 – 23,381 SF
Kitting's, Inventory Support, Assembly Fixture Design & Fixture Manufacturing

1810 – 9,933 SF
CNC Coiling & Bending

1808 – 8,713 SF
Raw Material Kan Ban Operations

1836 – 7,255 SF
Process Improvement Development

1848 – 6,880 SF
Machining Operations

1844 – 4,079 SF
Shop Supplies Kan Ban Operations

1850 – 6,943 SF
General Storage

  • Current total Square footage = 104,000 Sq Ft
  • Facilities = Owned
  • Energy Independence and going green

STEICO is dedicated to reduce its current dependency on the electrical power providers and controlling costs. This includes completed and future installations of high efficient office and manufacturing lighting, cool roof installations, wind and solar powered roof exhaust systems, roofing insulations, and expects to have approvals to install on site micro turbine generators in 2014 allowing STEICO to be 100% electrically self sufficient. This will control electrical costs and eliminate electrical blackouts yet create a redundant electrical system ensuring uninterrupted service.

Zodiac Aerospace, Spirit Aerosystems, Hamilton Sundstrand, Vought, Honeywell, Lockheed Martin, Northrop Grumman, Gessna, Goodrich, Boeing, Agusta Westland, HondaJet, Parker, GKN Aerospace, BE Aerospace, EATON, Bell Helicopter
Zodiac Aerospace, Spirit Aerosystems, Hamilton Sundstrand, Vought, Honeywell, Lockheed Martin, Northrop Grumman, Gessna, Goodrich, Boeing, Agusta Westland, HondaJet, Parker, GKN Aerospace, BE Aerospace, EATON, Bell Helicopter